Poor previous pointing work a client needed rectifying.
Poorly pointed area cleaned and repaired.
Two damaged pebble dashed bay areas, property circa 1930.
Defective pebbledashing removed then the bay is insulated.
The bay is then covered in steel reinforced mesh, to prevent cracking in future years and then rendered ready for the final coat.
The two bays completed using Tyrolean coloured render, providing a maintenance free finished product.
Repair of rotten floor joists and floor boards.
Bathroom in York, before.
Bathroom in York, after, reinforced with fibre glass mesh coverage to prevent cracking.
Bathroom painted.
Creation of an opening for a wood burning stove, before.
Opening for a wood burning stove, after.
Damp proof course installed and plaster matched to cottage finish plaster.
Walls chemically injected, then tanked. Ready for installion of GTEC thermal insulation boards.
Walls with both rising damp and penetrating damp drying after installation of damp proof course and GTEC Thermal Insulation boards then replastered